Good evening everyone.
1-An electric part burned out in our front door. It was ordered today. It is made in China, so we have no idea when it will arrive. In the meantime, if you come in the front door, after you swipe your fob you need to grab the handle and pull immediately. Otherwise, please use the back door. Once in awhile the front door does work.
2-The 2nd floor parking lot is being stripped. It should take a couple of weeks to finish.
3-Stack 4 is awaiting railing repairs. The contractor is due on Saturday.
4-Stack 5 has some adjustments need to be made and some parts needed are on order, but haven't arrived yet.
5-Stack 6 work is continuing. They are estimating that they can begin the completion check list in about 2 weeks.
6-Stacks 7 and 8 are having concrete pouring beginning. We also found out that in the original construction no structural steel was put at the ends of the balconies on stack 8. It is now being added so that the railings and balcony are stronger. No one can even guess why it was not built with it originally or how it passed inspection when the building was built.
If you want to see something amazing, gaze up at stack 8. You can see how much concrete had to be removed. There is one balcony that had to be completely removed and rebuilt. We have been lucky over the past 50 years.
Stan
Коментари