1-We now have 10 units in stacks 4 and 5 that passed all inspections and are done! We have 24 that the contractor says are complete and are awaiting their final inspections! Those inspections are expected to be done over the next 2 weeks.
2-As soon as the rest of the inspections on stacks 4 and 5 are completed, they will start on stack 6 inspections.
3-Stack 7 is currently having the bedroom window facing worked on. The concrete and stucco work on stack 7 is completed and they are waiting to pitch the deck of the balcony.
4-Stack 8 has completed the first phase and is waiting for the engineer to set excavation limits.
5-Work on the parking deck is continuing. Repairs are almost complete.
6-The front of the building will have excavations going on for a week or two.
7-As always, remember that progress depends on weather and what is found when the outside concrete is removed.
Stan