1-Can I get a "Halleluyah!" The wet room roof was started today. It should be done by tomorrow.

2-The 7 stack bedroom windows are done and painted. The swing stage has been moved next to the balconies so the painters can paint the column there. They should be done by the end of the week. Then that swing stage will be moved to the fire stairs. Work on the balconies is continuing.

3-6 stack final inspections were continuing until the heavens opened up again a little while ago.

4-8 stack balcony edges are being repaired. The front of the building, 8 stack bedroom windows, will hopefully be done shortly so the front can then be painted and the swing stage moved to the other side of the front, the stack 1 windows.

5-Stack 1 has started with tile removal on some balconies. The rest is coming soon.

6-I have received questions about the pool. I am told that realistically we can't expect the pool area to be ready before December. No work can even be done there until 8 stack balconies are done overhead. The pool and the pool deck all needs to be done.

A reminder that the link for tonight's meeting is on the email Ali sent out this morning.

Stay safe,

Stan

117 views0 comments

Recent Posts

See All

Spring Farewell Party

Friday, April 12th, at 5pm Pool Cabana Room You are all invited to our farewell party for the seasonal residents that will be flying...

Comments


Commenting has been turned off.
bottom of page